规范项目管理、理顺经济关系专题会汇报材料
XXXX项目部
一、项目基本情况
1.对下合同签订情况。(主要是与分包方真实下家的劳务、物资供应商、设备租赁商等的合同签订情况,程序是否完善)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
2.物资招标采购情况(主要是分包方的物资招标采购等手续是否按照公司程序完善)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
3.设备采购、租赁情况(主要是分包方的设备采购、租赁等手续是否按照公司程序完善)
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
4.项目成本入账情况
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
5.资金拨付情况
XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
二、项目目前存在的主要问题及原因分析
(主要从项目进度、安全、技术质量、物资设备、计划合同、财务资金、信息化及内业资料等方面对目前存在影响项目正常运转的主要问题,特别是在物资设备采购及管理、验工计价及合同、财务资金支付使用、线上线下手续完善方面存在的问题说清楚,并分析问题存在的主要原因)
1.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)
三、本项目下一步工作安排及采取的主要措施
1.XXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXXX。(正文为仿宋国标三号字)