1.A/C duct and vent duct structure of W/H Deck.驾驶甲板空调、机械风管结构。

2.Inspection the structure and loading test of the lifeboat(Rescue boat)davit.救生(助)艇吊架结构和压重试验。

3.Ref.Freon piping to be done air-tightne test and vacuum test.冷藏氟利昂管系密性试验和真空试验。

4.Ref.Plant to be done protection device test and cooling-down test.冷藏机组保护装置试验及打冷试验。

5.Accommodation air-condition Freon piping to be done air-tightne and vacuum test.房舱空调氟利昂管系密性试验和真空试验。

6.Accommodation to be done air flowing adjustment test.房舱风量调整试验。

7.E/C room Package A-C to be done function test.集控室单位式空调效用试验。

8.E/R air drier to be done function test and alarm test.机舱空气干燥器效用试验及报警试验。

9.Superstructure water-tightne doors and windows to be done hosing test.上层建筑水密门窗冲水试验。

10.Cabin supply fan to be done function test.房舱风机效用试验。

11.Superstructure lifesaving and fire fighting equipment to be done inspection.上层建筑救生、消防设备交验。

12.Galley and laundry equipment to be done function.厨房、洗衣间设备交验。

13.Refrigerator to be done function test.冰箱效用试验。

14.Rescue boat davit(life raft davit)to be done static(dynamic)loading test.救助艇架(救生筏吊架)静(动)负荷试验。

15.Mushroom outlet closing and opening by hand to be inspected.菌形风帽手动启闭试验。

16.Superstructure compreed air(water supply、fire fighting、smoke detection)piping to be done air-tightne test.上层建筑压缩空气管系(供水管、消防管、烟雾探测管)密性试验。17.

Cabin condensation piping to be done free-flowing test.房舱凝水、落水管系畅通试验。

18.Deck flushing piping system to be done air-tightne test.甲板冲洗管系密性试验。

19.Painting RM.Fire fighting pipe to be done air-tightne test.油漆间消防管系密性试验。

20.W/H water spray pipe to be done function test.驾驶室水喷淋管系效用试验。

21.Insulation of A-deck(including A60 insulation).A甲板绝缘(包括A甲板A60绝缘)。22.

Floating floor of E/C RM.集控室浮动地板。

23.Insulation of emergency generator room(including A60 insulation).应急发电机室绝缘(包括应急发电机室A60绝缘)。

24.Insulation of escape in E/R.(including A60 insulation).机舱逃口绝缘(包括机舱逃口A60绝缘)。

25.Insulation of F11# bulkhead in E/R.(including A60 insulation).F11#舱壁绝缘(包括F11#舱壁A60绝缘)。

26.Completene of all cabins to be inspection.全船房舱完整性提交。27.

Inspection insulation installation for master room, Chief engineer room,electrical engineer room before install panel.船长室、轮机长室、电机员室上板前检查隔热安装。28. Completene delivery of accommodation(joiner work and interior decoration of accommodation)for master room(chief engineer room).船长室(轮机长室)舱室完整性(木工和内部装饰)提交。