ISO程序文件中英文版03合同确认与评审程序_iso程序文件中英文版

2020-02-27 其他范文 下载本文

ISO程序文件中英文版03合同确认与评审程序由刀豆文库小编整理,希望给你工作、学习、生活带来方便,猜你可能喜欢“iso程序文件中英文版”。

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office 1.目的: 准确理解客户要求,确保合同规定及其执行的要求,满足客户要求。

Purpose:To learn about the customers’ needs well, to ensure that the provisions and implementation of contract will meet customers’ requirements.2.适用范围: 适用于所有销售合同的确认及评审。

Applicable Scope:Apply to all the verification and review of sales contracts.3.职责 Responsibility 3.1 生产技术部负责编制《标准产品清单》及对非常规产品的技术标准及客户要求进行评审。

The Production & Technique Dept.shall prepare the “Standard Product List” and shall review the technical standards and the customers’ requirements of unconventional products.3.2市场部负责对常规产品的评审,对非常规产品的价格、付款方式、交货方式的评审及顾客特别技术要 求评审的组织工作。

The Marketing Dept.shall review conventional products, organize to review the price, the type of payment and delivery way of unconventional products, also shall review the customers’ special technical requirements.3.3董事/总经理或市场总监负责非常规合同评审的审批。

The General Manager or the Chief Marketing Officer shall approve the review of unconventional contracts.3.4 生产部负责对非标产品合同供货期的评审、负责与仓库联系了解库存量和供货情况。

Production Dept.shall review the delivery time of non-standard products, shall contact with the Warehouse to know the inventories and availability.3.5 采购部负责对非常规的订单产品材料、外协件的供货能力的评审。

Purchasing Dept.shall review the unconventional products material of orders and supplying capacity of external machining.3.6 品保部负责对非常规产品质量检验能力的评审。

QC.Dept.shall review the testing capability of unconventional products.3.7成套工程部负责对非常规成套产品生产能力、供货期的评审。

The Panel Department shall be responsible for reviewing the production capacity of complete set of unconventional product and the delivery date.4.工作程序 Work Procedure 4.1生产技术部负责编制《标准产品清单》,规定常规产品的具体型号及其要求,以便日常销售合同签订、生

Author:

Checked by:

Approved by:

1/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office 产、检验等参考使用。

The Production & Technical Dept.shall prepare the “Standard Products List” to regulate specific types and requests of conventional products, in order to provide reference for signing sales contract, manufacturing, testing, and so on.4.2顾客要求的识别Identification of customers’ requirements

4.2.1市场部销售人员接到顾客订货要求后,应与顾客进行充分沟通,根据顾客规定的订货要求,做好相 关记录(如合同草案、技术协议及口头订单等),并及时转达到市场部办公室,由市场部办公室通知各区 域销售负责人作进一步跟进处理。

The sales personnel shall communicate with the customers when receive the orders, make the relevant records in accordance with the order’s requests(such as the contract draft, technology agreements and oral orders, etc.)and transfer it to the Marketing office promptly, the Marketing office shall notify every regional sales leader to take further action.4.2.2当各区域销售负责人与顾客沟通确认可达成技术协议要求的(包括与顾客商议的产品质量要求、实 用性、报价、交货期、付款方式、交货方式、服务等条款内容),经市场总监或市场部办公室确认后,由 市场部办公室与顾客沟通联络。

If the regional sales director and the customers come to technology agreements(including requirements for product quality, practicality, price, delivery time, the type of payment, delivery way, service and other clauses), the Marketing Dept shall communicate with the customers when it is approved by the Chief Marketing Officer or the Marketing office.4.3合同评审Contract Review 4.3.1合同的分类 Contract Claification 4.3.1.1常规合同:对《标准产品清单》中已规定的定型产品的合同。

Conventional contract: The contract of specific product that has been prescribed in the “Standard Product List”.4.3.1.2非常规合同: 对《标准产品清单》未作规定的产品合同,如新产品开发或型式试验产品或由定型产品改进要求的合同。

Unconventional contract: The contract that is not prescribed in the “Standard Product List”, such as the contract for development of new products, or product of type test or the contract required to improve specific product.4.3.1.3成套工程合同:对顾客要求由公司提供成套柜体工程的产品(包括成套工程中的一、二次方案)。

Author:

Checked by:

Approved by:

2/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office The engineering contract of panel: the contract that provides panel products for customer(including the single line diagram and the secondary diagram in the whole project);4.3.2常规合同评审Review of conventional contract 4.3.2.1对于有现货的常规合同,直接由市场部办公室在“商品成交合同”中进行确认评审,经市场总监或办公室主任审核后,即视完成合同评审。

For conventional contract of spot transactions, the Marketing Dept.shall directly confirm the review in the “Commodity Transaction Contract”, finally the Chief Marketing Officer or the director of office audit the contract.4.3.2.2对于无现货的常规合同, 由市场部办公室将顾客要求在“商品成交合同”中标注,经销售总监或办公室主任审核后,转化为公司内部“订单生产指示”,注明产品的型号、规格、数量、要求出货日期,并附上顾客其它技术条件要求(如有),即视完成合同评审。

For conventional contract of products without stock, the Marketing Dept.shall remark the customer requirements in the “Commodity Transaction Contract”, it will become an internal “Production Instructions of Order” with product type, specification, quantity, requested delivery date, after being audited by the Chief Marketing Officer or the director of the office, finally attach other technical requirements if there is any.4.3.3非常规产品的评审Review of unconventional product 4.3.3.1根据公司目前情况,非常规产品主要表现在:

According to current situation of the company, the unconventional product refers to: a).结构、尺寸不在规定范围内,或未列入正式说明书内等;

The structure, dimension go beyond the stated scope, or has not been listed in the formal specification, etc.b).应用场合并非正常使用范围内,如天气、海拔高度;

The applicable situation is not the normal ambient, such as weather, the altitude.c).用途如在保护范围外(包括型式试验或配套等其他有特别要求产品);

Its function is beyond the protection scope(including the type test or supporting products, and other products with special requirements).d).顾客应用于型式试验的产品。

Products that customer use in type-test 4.3.3.2对非常规产品合同,由市场部办公室负责填写“合同评审表”,注明顾客的特别要求(或附件),协调组织相关部门对顾客要求进行相应的评审工作,并跟踪评审过程中所提出问题的解决及评审结果的实现。

Author:

Checked by:

Approved by:

3/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office For unconventional contract, the Marketing Dept.office shall fill in the “Contract Review” ,with the special requirements of customer(or annex)in it, organize and coordinate relevant depts.to review the customer’s requirements, and track whether the results can be achieved , whether the problems are solved.4.3.3.3各部门就顾客要求中与本部门工作有关的内容进行评审及签字确认:

Every dept.shall review the customer requirements related to his/her sector, and sign to confirm it a)采购部负责合同要求中物品供货能力的评审;

Purchasing Dept.shall review the supplying capacity required in the contract;b)生产部负责合同产品中所涉生产工艺性的满足情况及交期的评审;

Production Dept.shall review whether the product meet the production and craft requirements, whether the product is delivered in time;c)生产技术部负责合同产品中设计开发能力及满足相应法律法规要求的评审;

The Production & Technical Dept.shall review the capacity of design and development, review whether it meets the relevant statutory and regulatory requirements d)品保部负责合同产品中质量要求的检测能力的评审;

The QC Dept.shall review the testing capacity required by product quality;e)市场部负责合同要求中产品的价格、付款方式、交付条件等满足能力要求的评审。

The Marketing Dept.shall review whether it is able to meet requirements of price, the type of payment, delivery, and so on.4.3.3.4在合同评审过程中,当评审人员对产品要求中有关内容提出问题或修改建议时,由市场部负责与顾 客沟通联系,征求顾客意见,并将沟通结果记录于“商品成交合同”中。

In the proce of contract review, the Marketing Dept.shall contact with customer for their advices and feedback, when the reviewer propose some problems or suggestions about product requirements.The results shall be recorded in the “Commodity Transaction Contract”.4.3.4成套工程合同评审Review of Panel Contract 4.3.4.1市场部负责收集顾客成套工程中所提供的一、二次方案及其它特别要求,并摘录到“顾客技术咨询表”上,同时将相关资料转达到成套工程部。

The Marketing Dept.shall collect the single line diagram, the secondary diagram and other special requirements provided by customer in RMU panel project, extract them to the “Customer Consultation Form” and then send the

Author:

Checked by:

Approved by:

4/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office relevant datum to the Panel Dept.4.3.4.2如经成套工程部评审后确认能满足顾客要求的,在“顾客技术咨询表”上签名确认,并反馈到市场部办公室,即视完成合同评审。

The Panel Dept.shall sign on the “Customer Consultation Form” if it is confirmed able to meet customer requirements, finally make feedback to the Marketing Dept.office.4.3.4.3如经成套工程部评审后确认不能完全满足顾客要求的,应立即通知市场部,或由市场部安排与顾客 进行电话沟通,或提供与顾客要求相类似的本公司的一、二次方案图供顾客参考确认。

The Panel Dept.shall immediately inform the Marketing Dept.if it is confirmed can not meet the requirements completely, the Marketing Dept.shall arrange a telephone communication with the customer, or provide the single line diagram or the secondary diagram of our company that is similar to the customer requirements for reference.4.3.4.4所有顾客提供的成套工程的一、二次方案及相关技术条件要求,均须由成套工程部负责转换成本公司的一、二次方案,并由市场部办公室回传顾客确认。经顾客确认后再反馈到成套工程部,以便成套工程部组织满足顾客订货要求的技术工艺性文件编制和设计工作。

The Panel Dept.shall change all of single line diagram or secondary diagram and relevant technical condition requirements provided by customer into the company’s ones, which will be returned to customer for confirmation by the Marketing Dept.Make feedback to the Panel Dept.after the customer confirm them, in order that the Panel Dept.can prepare and design the technical documents that meet the requirements of order.4.3.4.5如成套工程中所涉是本公司非常规产品的相关要求的,则由市场部组织按本程序中的4.4.3执行。

If the panel project refers to the relevant requirements of unconventional product in our company, the Marketing Dept.shall organize the implementation in accordance with clause 4.4.3 in this procedure.4.3.5所有经评审完成后的“合同评审表”,由市场部负责提交到董事/总经理或市场总监核准审批生效。

The Marketing Dept.shall submit all of “Contract Review Form” to the General Manager or the Chief Marketing Officer for approval before it becomes effective.4.4合同的确认Confirmation of Contract 4.4.1常规合同直接由市场部办公室在“商品成交合同”中确认即可。

The conventional contract shall be confirmed directly in the “Commodity Transaction Contract” by the Marketing Dept.4.4.2非常规合同经相关部门评审,并与顾客取得一致后,由市场部办公室建立“商品成交合同”。

Author:

Checked by:

Approved by:

5/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office The Marketing Dept.shall establish a “Commodity Transaction Contract ” if the unconventional contract has been reviewed by the relevant departments, and agreed by the customers.4.4.3成套工程合同经成套工程部、市场部与顾客沟通达成一致后,由市场部办公室建立“商品成交合同”。

The Marketing Dept.shall establish a “Commodity Transaction Contract” if the Panel Dept., the Marketing Dept.and the customer.come to agreement on the contract of panel.4.4.4经建立“商品成交合同”后的合同,由市场部办公室转化为公司内部执行的“订单生产指示”(对成套工程,还应附上顾客确认的相关要求),并下达到各相关部门按订单指示要求执行。

The Marketing Dept.shall establish the “Commodity Transaction Contract”, and shall change it into “Production Order Instruction”(as to complete set proce, shall attach related customer confirmed requirements), and release it to the relevant depts.for implementation.4.5合同的更改与控制 Change and Control of Contract 4.5.1常规产品的合同更改,由市场部负责直接更改“商品成交合同”中相关内容与客户进行确认,并将更改后的顾客要求传达到各相关部门,同时保持相应的更改合同记录。

For the changes of conventional contract, the Marketing Dept.shall directly change “Commodity Transaction Contract” and confirm related matters with customer, and release the revised customer requirements to the relevant depts.The record of changes should be maintained.4.5.2对非常规产品或成套工程合同的更改,由市场部办公室负责补充或组织按本程序中的4.3执行。

As to changing the contract of unconventional product or the whole project, the Marketing Dept.shall take responsibility of adding, or organizing to change it in accord with clause 4.3 in this procedure.4.6评审记录与合同管理Review Record and Contract Management 4.6.1合同属于公司机密文件,需专人严格保管;市场部负责建立“客户档案”,将合同评审相关资料及“商品成交合同”归入“客户档案”。

Contracts are confidential documents of the company, which should be strictly kept by special person;the Marketing Dept.shall establish “Customer Files”, and file the relevant information of contract review and “Commodity Transaction Contract” in it.4.6.2合同评审中相关记录按《记录控制程序》执行。

The relevant records of contract review shall be maintained according to the “Record Control Procedure”.4.6.3合同确认后的技术要求,如成套柜体的一、二次方案或柜体设计图纸等的发放按《技术图纸管理规定》

Author:

Checked by:

Approved by:

6/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office 执行。

The iuance of confirmed Technical requirements such as the single and second program of the panel or design drawing and so on, shall be in accordance with the “Technical Drawing Management Rules”.4.7合同的执行及控制Implementation and Control of Contract 4.7.1正式合同签订后,由市场部将合同及“合同评审表”存档,并下达“订单生产指示”,经生产部主管 签字确认后送相应部门作为生产计划、成品检验及包装出货的依据。

When the formal contract is signed, the Marketing Dept.will archive the contract and the “Contract Review Form”, and also release the “Production Order Instruction” to the relevant departments as a basis of production planning, product testing and packaging for shipment after being verified by production director.4.7.2 非标产品的“合同评审表”在评审批准后,由市场部将“合同评审表”副本,附在“订单生产指示 后,给各有关部门参考。

If the review is approved, the Marketing Dept.shall copy the “Contract Review Form” of non-standard product and attach it to the “Production Order Instruction” as a reference for the relevant departments.4.7.3对常规产品,市场部可根据市场销售预测,在未签定合同时,经董事/总经理或市场总监批准后下达“订单生产指示”,以备库存,满足客户紧急出货之要求。

As to standard product, before signing the contract, the Marketing Department shall iue the “Production Order Instruction” based on the market sales forecasts, with the approval of the General Manager or the Chief Marketing Officer, in order to prepare for inventory, and to meet urgent shipment requirements of customer.4.8市场部对外负责在产品的售前、售中根据需要随时与顾客保持沟通,回答顾客咨询,反映合同进展情 况。对内负责监督检查订单合同的执行情况,当出现问题时,立即向董事/总经理或市场总监汇报。

The Marketing Dept.shall communicate with customer at any time needed in the before sales service stage also in the proce of service, respond to customer’s consultation, and reflect progre of contract.Marketing Dept.shall monitor and inspect the performance of order, give report immediately to the General Manager or the Chief Marketing Officer if any problem takes place.5.相关文件Relevant documents 5.1标准产品清单Standard Products List 5.2记录控制程序Record Control Procedure 5.3文件控制程序Document Control Procedure

Author:

Checked by:

Approved by:

7/8

Version

B/0

Revised Version:

Revision File Name:合同确认与评审程Contract Verification and Review Procedure Effective Date:

Edited by:ISO Office 5.4技术图纸管理规定Technical Drawing Management Rules 6.记录Records 6.1 合同评审表Contract Review Form 6.2 商品成交合同Commodity Transaction Contract 6.3订单生产指示Production Order Instruction 6.4客户档案Customer Files 6.5顾客技术咨询表Customer Consultation Form

Author:

Checked by:

Approved by:

8/8

《ISO程序文件中英文版03合同确认与评审程序.docx》
将本文的Word文档下载,方便收藏和打印
推荐度:
ISO程序文件中英文版03合同确认与评审程序
点击下载文档
相关专题 iso程序文件中英文版 合同 程序 英文版 iso程序文件中英文版 合同 程序 英文版
[其他范文]相关推荐
    [其他范文]热门文章
      下载全文