中控操作员英语考试试题1_中控磨操作员考试试题
中控操作员英语考试试题1由刀豆文库小编整理,希望给你工作、学习、生活带来方便,猜你可能喜欢“中控磨操作员考试试题”。
中控操作员英语考试试题(窑操一级)
姓名:
一、单词释义(每空1.5分,共30分)1 cement 4 Raw Mill 7 limestone 10 proce 13 cooler 16 error 19 motor
二、英译汉(每题10分,共20分)
得分:reset 5 Coal Mill 8 power
3.clinker 6 kiln 9 automation 12 preure 15 silo 18 printer temperatureburner 17 display 20 clay1、As operators, we shall know well of not only control system in Central Control Room but also equipments at site..2、In 2003, CONCH GROUP would produce about 40,000,000 tons of cement and clinker.中控操作员英语考试参考答案(窑操一级)
一、单词释义(每空1.5分,共30分)1 cement 4 Raw Mill 7 limestone 10 proce 13 cooler 16 error 19 motor
二、英译汉(每题10分,共20分)
水泥 原料磨 石灰石 工艺 冷却机 错误 电机reset 5 Coal Mill 8 power
复位 煤磨 电源
3.clinker 6 kiln 9 automation 12 preure 15 silo 18 printer
熟料 窑 自动化 压力 库 打印机 temperature 温度 14 burner 17 display 20 clay
燃烧器 显示 粘土
1、As operators, we shall know well of not only control system in Central Control Room but also equipments at site..2、In 2003, CONCH GROUP would produce about 40,000,000 tons of cement and clinker.2003年,海螺集团将生产水泥和熟料约4000万吨。作为操作员,我们不仅要熟悉中控室内的控制系统,也要熟悉现场设备。中控操作员英语考试试题(窑操二级)
姓名:
一、单词释义(每空1分,共30分)1 kiln 4 preheater 7 bucket elevator 10 pump
2.cooler 5 calciner 8 bag filter 11 valve 14 lubrication 17 display 20 instrument 23 temperature 26 switch 29 lab
3.burner 6 roller station 9 belt conveyor 12 motor 15 hydraulic 18 trend 21 automation 24 preure 27 refractory brick 30 printer
得分: water injectionseal 19 alarm 22 flow sheet 25 moisture 28 transport
二、英译汉(每题10分,共20分)
1、Cement is manufactured in a series of procees: raw material preparing ,raw meal grinding, clinker burning, cement grinding.Main fuel for clinker burning in China is coal.2、As the top player of cement industry in China, CONCH GROUP would hold more than 34 kilns and produce about 40 million tons of cement and clinker in 2003.中控操作员英语考试参考答案(窑操二级)
一、单词释义(每空1分,共30分)1 kiln 4 preheater 7 bucket elevator 10 pump 窑 预热器 斗提机 泵
2.cooler 5 calciner 8 bag filter 11 valve 14 lubrication 17 display 20 instrument 23 temperature 26 switch 29 lab
冷却机 分解炉 袋收尘 阀门 润滑 显示 仪表 温度 开关 化验室
3.burner 6 roller station 9 belt conveyor 12 motor 15 hydraulic 18 trend 21 automation 24 preure 27 refractory brick 30 printer
燃烧器 托轮站 皮带机 电机 液压 趋势 自动化 压力 耐火砖 打印机 13 water injection 喷水 16 seal 19 alarm 22 flow sheet 25 moisture 28 transport 密封 报警 流程图 水分 输送
二、英译汉(每题10分,共20分)
1、Cement is manufactured in a series of procees: raw material preparing ,raw meal grinding, clinker burning, cement grinding.Main fuel for clinker burning in China is coal.水泥生产由一系列工艺过程组成:原料准备、生料粉磨、熟料烧成、水泥粉磨。在中国,熟料烧成所使用的燃料主要是煤。
2、As the top player of cement industry in China, CONCH GROUP would hold more than 34 kilns and produce about 40 million tons of cement and clinker in 2003.2003年,作为中国水泥工业的领头者,海螺集团将拥有水泥窑超过34条,生产水泥和熟料约4000万吨。中控操作员英语考试试题(窑操三级)
姓名:
一、单词释义(每空1分,共30分)dry proce 4 burner 7 motor 10 bucket Elevator 13 electric actuator 16 alarm lamp 19 flow sheet 22 lab 25 raw meal 28 refractory castable
2.rotary kiln 5 coal mill 8 solenoid valve 11 gas analyzer 14 expansion joint 17 automation 20 temperature 23 coal ash 26 burning zone 29 bypa
3.grate cooler 6 blending silo 9 shaft seal 12load cell 15 hydraulic pump 18 display 21 preure 24 alkali 27 heat balance 30 emergence stop
得分:
二、英译汉(每题10分,共20分)
1、The basic cement kiln system comprises a preheater in which feed material is prepared by heat exchange with hot exhaust gas, a rotary kiln in which the clinker occurs, and a cooler in which the hot clinker exchanges heat with cooling air.2、During the past 3 years, CONCH GROUP have built up about 16 rotary kilns using dry proce with pre-calciner,and in 2003, we would hold 34 cement kilns with the total capacity of about 40 million tons of cement and clinker..中控操作员英语考试参考答案(窑操三级)
一、单词释义(每空1分,共30分)dry proce 4 burner 7 motor 10 bucket Elevator 13 electric actuator 16 alarm lamp 19 flow sheet 22 lab 25 raw meal 28 refractory castable 干法工艺 燃烧器 电机 斗提机 电动执行机构 报警灯 流程图 化验室 生料 耐火浇注料
2.rotary kiln 5 coal mill 8 solenoid valve 11 gas analyzer 14 expansion joint 17 automation 20 temperature 23 coal ash 26 burning zone 29 bypa
回转窑 煤磨 电磁阀
气体分析仪
3.grate cooler 6 blending silo 9 shaft seal 12load cell 15 hydraulic pump 18 display 21 preure 24 alkali 27 heat balance 30 emergence stop
篦式冷却机 均化库 轴封 荷重传感器 液压泵 显示 压力 碱 热平衡 紧停
膨胀节 自动化 温度 粉煤灰 烧成带 旁路
二、英译汉(每题10分,共20分)
1、The basic cement kiln system comprises a preheater in which feed material is prepared by heat exchange with hot exhaust gas, a rotary kiln in which the clinker occurs, and a cooler in which the hot clinker exchanges heat with cooling air.水泥窑系统基本包括预热器、回转窑和冷却机。在预热器内,喂入的物料与热的废气发生热交换;在回转窑内形成熟料;在冷却机内,熟料与冷风进行热交换。
2、During the past 3 years, CONCH GROUP have built up about 16 rotary kilns using dry proce with pre-calciner,and in 2003, we would hold 34 cement kilns with the total capacity of about 40 million tons of cement and clinker..在过去3年时间内,海螺集团新建了约16条干法旋窑,均采用窑外预分解技术。2003年,集团将拥有水泥窑超过34条,生产水泥和熟料总量约4000万吨。中控操作员英语考试试题(磨操二级)
姓名:
一、单词释义(每空1分,共30分)1 clay 4 raw mill 7 bucket elevator 10 pump
2.limestone 5 belt conveyor 8 bag filter 11 valve 14 lubrication 17 display 20 instrument 23 temperature 26 switch 29 foundation
3.raw meal 6 separator 9 stacker 12 motor 15 hydraulic 18 printer 21 automation 24 preure 27crushing 30 silo
得分: water injectionseal 19 alarm 22 flow sheet 25 moisture 28 transport
二、英译汉(每题10分,共20分)
1、Nowadays,more than 80% of new raw mills are vertical roller mills, though many ball mills and roller preers are still in use.2、In 2003, CONCH GROUP would hold more than 34 kilns and produce about 40,000,000 tons of cement and clinker.中控操作员英语考试参考答案(磨操二级)
一、单词释义(每空1分,共30分)1 clay 4 raw mill 7 bucket elevator 10 pump 粘土
原料磨
2.limestone 5 belt conveyor 8 bag filter 11 valve 14 lubrication 17 display 20 instrument 23 temperature 26 switch 29 foundation
石灰石 皮带机 袋收尘 阀门 润滑 显示 仪表 温度 开关 基础
3.raw meal 6 separator 9 stacker 12 motor 15 hydraulic 18 printer 21 automation 24 preure 27crushing 30 silo
生料 选粉机 堆料机 电机 液压 打印机 自动化 压力 破碎 库 斗提机 泵water injection 喷水 16 seal 19 alarm 22 flow sheet 25 moisture 28 transport 密封 报警 流程图 水分 输送
二、英译汉(每题10分,共20分)
1、Nowadays,more than 80% of new raw mills are vertical roller mills, though many ball mills and roller preers are still in use.2、In 2003, CONCH GROUP would hold more than 34 kilns and produce about 40,000,000 tons of cement and clinker.2003年,海螺集团将拥有水泥窑超过34条,生产水泥和熟料约4000万吨。虽然球磨机和辊压机仍有使用,但目前80%以上的新原料磨采用立式辊磨。
中控窑操作员试题一. 名词解释(每题5分) 1.、最低共融温度2.f-CaO3.结皮 4.黑影二.填空(每空1分)1.分解炉内燃料的燃烧方式为( )和(),传热方式为( ) 。 2.篦式冷却机的篦床传动主要由( )和(......
一、填空题(共25分,每空1分)1、硅酸盐水泥熟料的主要化学组成为 CaO、SiO2、Al2 O3、Fe2O3 ,还有少量的 Mg0 。其主要矿物组成为 C3S、C2S、C3A、C4AF 还有少量 f- CaO、方镁石......
天瑞集团水泥公司中控磨操作员考试试题单位: 姓名:得分: 一. 填空题(每空1分,共30分)1.按工艺流程方式球磨机可分为( )和( )两种。 2.低碱水泥的钠当量含量不得大于( )。 3.球磨机的研磨......
中控调度员及操作员中期试题岗位: 姓名 得分一、填空题(共7题,每空2分,共24分)1、我公司目前常用的骨料有、、。2、开机生产混凝土时,空压机需要 个气压才能生产。3、在正常生产过......
原料磨中控操作员选拔试题姓名: 岗位: 得分:一、填空题:(每题1分,共30分)1、磨机的型号 ,磨盘直径 ,磨辊的规格 ,磨盘转速 。2、原料立磨兼有、、、、 五项功能。3、磨喷水的作用、 。......