船厂生活用语(Life in The Yard)_船厂生活用语

2020-02-29 其他范文 下载本文

船厂生活用语(Life in The Yard)由刀豆文库小编整理,希望给你工作、学习、生活带来方便,猜你可能喜欢“船厂生活用语”。

船厂生活用语(Life in The Yard)the meaning of that word? 1. 还习惯吗?Have you got used to life here? 28. 有件事情要和你谈一谈。There’s something I should like23. 完全可以。By all means.4. 小心,当心。Be careful(Take care).5. 正是这样,对啦。Just so.6.7. 好,可以,行。All right.8. 请休息会儿。Have a rest(break), please.9.

哦,我明白了。Oh, I see.10.11. 给你,接着。那样更好一些。Here you are.That’s better 12.13. 抓好扶手。Please hold the handrails well.请看这(那)个。请用对讲机。Look at this(that)one.14.15.

请继续,我听着呢!Please use your intercom.Go on please.I’m listening 16. 一点也不麻烦。我不懂。I don’t understand.It’s no trouble.17. 就是这些,完了。That’s all.18. 听我说。Listen to me.19.20.

注意。再来一次。Mind.Once more.Once again.21. 我要象这样的。I want something like this.22. 请再说一便好吗?I beg your pardon.23. 现在可以开始了吗?Shall we begin now? 24..

让我检查一下。问题(毛病)Let me have a check.在哪儿?What’s the trouble? 25.What 这’s wrong with it? 鼓风机怎么了?What’s wrong with the 26.blower? 质量(设备)怎么样?HowWhat about quality 27.(equipment)? 那个单词是什么意思?

What dose that word mean? 2930.speak to you about.. 我得等多久?How long do I have to wait? 31.I want to explain.有件事情我要解释一下。There is a certain matter 到什么时候你才有空?Up to what time shall you 3233.be free..

位置不对。图纸有问题。The position is wrong.There’s something wrong with the 34.drawing.心,很容易解决的。这是唯一可以解决的办法。Don’t worry.ThatThis is ’s easy to deal the on别当3536.with..

ly way out.如果你能够的话,尽量早一些来。Try to come 37.earlier, if you can.我在三点中左右等你。I’ll look out 3839.about three.for you at .

一定要想办法做。恐怕你在这一点上弄错了。Do try to do.I’m afraid you 4041.mistaken there.are 那也正是我所认为的。That’s just what I think.42.43. 我的意见也是那样。That’s my opinion too.44. . 我们一定去好吗? 开始验收吧?我打电话给你,怎么样?Let’s start to check some items.Shall we go together?

Suppose I telephone to 45.you.您同意接受吗?Will you accept it?

What46.’s to accept the offer.我们十分愿意接受这个提议。We are quite ready

47. 可能。Poibly(Probably)48. 这是我的名片。This is my busine card.69. 49. 您满意吗?are you satisfied with it? 50. 我希望再见到你。I’m looking forward to seeing

bored round.操舵装置仍偏差2度。The steering gear still has a deviation of 2 degrees.请检查一下尾轴锥形部分。Please check the 5152.you again.让我们喝杯茶休息一下吧。Let’s take a tea break.53.54.

禁止抽烟。谢谢你的夸奖。No smoking.Thank for your compliment.55.56.

请说慢一点。请写在这儿。Please speak more slowly.57.58. 我不认为如此。Please write it here.I don’t think so.59. . 多可惜!真遗憾。振动(Thatwhat a pity!温度’s too bad.、压力、速度)是正常60.vibration(temperature 压力大于正常值。、preureThe preure、speed)is normal.的。is more than 6162.normal .

速度低于正常值。对不起,还没完工呢。The speed is le than normal.Sorry, it has not been 63.finished yet.船用机械设备安装用语(提交(验收)成功。Submiion(delivery)is okay.English for Installation of Marine Machine6465..

锚机可以使用了。)

所以螺母应该用冲击锤上紧。The windle is ready for use.All the nuts should 66. be tightened up with an impact wrench.应把螺旋桨拆下。The 67. dismantled.propeller should be 机舱通风应改装。The 68. room should be refitted.ventilator in the engine 液压缸应镗圆。The hydraulic cylinder should be 71. conical part of the tailshaft.舵机和舵轮的运动不一致。72. not in step with the steering wheel.The steering gear is 舵角指示器的误差太大。73. angle indicator is too large.The error of the rudder 指示器应调整。been installed.The indicator water system had 74. 给水系统已经安装完毕。The 75.

had been installed.The feel water system 我们正在安装热水供暖系统。76.

the hot water heating system.We are installing 生活用水系统出了什么毛病?77. with the domestic water system?

What’s wrong 柱塞应从套筒里抽出来。78. withdrawn from sleeve.The plunger should be 磨削缸套,除去刮痕。79.

grinding the linear.Remove the scuffings by 做一个拆装汽缸盖螺帽用的环形扳手。80ring spanner for the nuts of the cylinder cover.Make a 81..

环形扳手在哪里?环形扳手在我这里。Where is the ring spanner? 82hand.The ring spanner is in my 83..

你需要扳手吗?请把环形扳手给我。Do you need the spanner?

84.

spanner.Please give me the ring 请检查一下油水分离器。water separator.Please inspect the oily 85. 1号起重机已经拆除。8687. removed.No.1 cargo winch has been 88.. 起重机已经安装。Cargo winch has been installed.请仔细检查一下。鼓风机应装在哪Please inspect it carefully.儿?Where is the 89. installed.blower 所有阀闸都应拆除。All the gates have to 90. disconnected.be 泵打不出压力。The pump fails to build 91. preure.up 拆开泵检查密封。92. seal.Dismantle the pump to check its 在通海箱上安上93. zinc slabs in the sea chest.2块锌板。Fit up two pieces of 我们已经完成管路系统的安装。We have 94. complete the installation of the piping.管路出了什么问题?What’s wrong with 9596.. piping system?

the 管子漏气。恒温器动作迟钝。There is the air leakage from the pipe.97. stagnant.The motion of the thermostat is 制冷设备失灵了。98. operation.The refrigerating plant is out of 使锌板与外壳接触良好。Bring the zinc plates 99. into good contact with the casing.安全阀是成对安装的。Relieve valves are 100. mounted in pairs.安全阀安装在锅炉上。Relieve valves are 101. mounted on the boiler.这steering gear? 台舵机是什么型号的?What type is the

102. 这种舵机是电动液压式的。103. of the electrohydraulic type.This steering gear is

舵机是船上很重要的设备之一。gear is one of the most important devices The steering

in the 104. ship.舵机的主要功能是控制船舶的航向。function of the steering gear is to control the ship’s The main

105. course.这台制冷机的能量是多少?What is the capacity

106. of this refrigerator.螺旋桨出了什么问题?107. propeller?

What’s wrong with the

螺旋桨工作不稳定。The propeller can’t 108. well.work

阀体内部应涂上漆。The inner part of the valve

109. body should be coated with the paint.尾门需要重新安装。The stern door should be

110. reaembled.起货机已经安装好了。The cargo winch has been

111112.. installed.盘车机坏了。我们正在安装起锚设备。The turning gear is damaged.113. handling machinery.We are installing anchor

检查一下造水机。114. generator.Make a check of the fresh water

锚链轮应与锚链贴合。The wildcat should be

115. fitted in with the anchor chain.锚机刹车失灵。The break of the windla is out of

116. order.请将repaired.锚机修一下。Please make the windla 117. 变幅马达用来升降吊臂。The luffing motor is 118. used for raising or lowering the job.起重机安装好了没有?Had the cargo crane been 119. installed? 请将这个穿舱件改成水密的。Please change this 120. penetrating piece into watertight construction.先进行管道分段预装。Go on pre-installation 121. piping in hull section first.of 板块连接有问题。There’s something wrong with 122. the plate connection.这个箱柜怎么没有安装泄放阀?Why didn’t you 123. fit a drain valve on this tank? 这样布置给以后操作及维护工作带来不便。Such an arrangement is inconvenient to the future 124. operation and maintenance.控制箱振动太厉害。The control box 125. seriously.vibrates 我们在安装避雷装置。We are installing the 126. lightning arresters.避雷装置安装在哪里?Where 127. arresters installed?

are the lightning 装上散件并定位好。Loading piece parts and 128. positioning well.阀门传动装置安装在另一舱室。The 129. actuating device is installed in another room.valve 蒸汽室的空间太大。130. too big.The size of the steam chest is 这些结构的焊接变形太严重了。The welding 131. distortion of these structure is too serious.螺propeller has been finished.旋桨的安装已经完成。The mounting of

132. 请进行螺旋桨胶合连接。Please bond the

133. propeller to shaft.螺旋桨液压无键连接。Mounting of propeller by

134. hydraulic jack.螺旋桨的螺距需要矫正。Check of propeller pitch

135136.. is needed.螺旋桨锥孔修正。计137. calculation method.算法轴系校中Scrapping of propeller bo.。Centering of shafting by

轴承负荷法轴系校中。138. loading method.Centering of shafting by

平轴法轴系校中。139. connection.Centering of shafting by direct

尾轴管轴承塑料喷漆。Spraying of plastic 140. stern tube bearing.on

轴系中心定位块在那里。The center block for

141. shafting alignment is over there.下汽缸和轴承座找正。Alignment of 142. casing and bearing seating.bottom

这里需要进行螺栓热紧。Tightening of bolts in

143. hot state is needed here.螺旋形卷管机在哪里?144. machine?

Where is the pipe coiling

我们更换了两盏探照灯。We have replaced two

145. searchlights.请脱开盘车机。146147.gear.Please take out the engine turning

148. 将盘车机合上。Put in the engine turning gear..

启动循环泵。脱开操纵联动机构。Start up the circulating pump.linkage.Disengage the maneuvering 149150..

开阀有没有什么机械需要送到车间去?/关阀。Open/close the valve.Is there any 151. machinery to be moved to the workshop? 你们何时开始安装起货机?When will you begin 152. to install the cargo winches? 螺旋桨太大移不动。153. move.The propeller is too big to 在两端盖板装好后应对内部管子进行水动力实验。After the end covers are fitted back, a hydraulic test should be applied to the inside 154. tubes.设备修理好了,你可以使用了。The 155. has been repaired.Y你们有这部压缩机的整套配件吗?ou can use it now.machinery

Do you 156. a complete set of spare parts for this compreor?

have 滑油泵的位置不适当。检测、测试用语(pump is not suitable.The position of the lube oil English for check & test)1.2.3.做管道密封性实验。Let’s do the tightne test of pipeline.4.请再检查一遍。Please check it again.5.开始做冲击实验。有点小问题。Let do the impact test.6.7.我们马上解决。These are something wrong.绞盘位置不对。We will solve it immediately.8.9.用检漏灯检漏。The position of the winch is wrong.这些螺母应换新。Look for leaks with test lamp.这根管子应远离蒸汽管。These screws should be renewed.10.away from steam pipes.This pipes should be kept well 螺11.be examined and tighted.丝和螺栓应检查上紧。The screws and the bolts are to 这块板已经严重腐蚀。This plate has been serious rotted.12.这个叶片应进行热处理。13.14.treatment.The blade should undergo heat

对整叶片进行表面抛光。个系统应进行检漏。Surface finish the blades.The whole system should be 15.detected for leakage.把钢管做成喇叭口形状以便接上活络接头。Flare up the 16.copper tube to connect a union.这17.and its branch have to be shaped.段管子及其支管都需整形。The full length of this pipe 管端有严重腐蚀。18.tube ends.These is very serious corrosion on the 把所有管子接头脱开。Dismantle all the piping 19.connection.20.21.拆 泵开泵检查密封。请壳腐蚀了。检查一下淡水系统。The pump casing is corroded.Dismantle the pump to check its seal.Please check the fresh 22.23.system.water 重把力水柜再哪里?Where is the gravitation tank? 24.distributor.启动空气分配器解体检查。Overhaul the starting air 建turbo-charger 议涡轮增压器装上过滤消音器。

It is suggested that the25.推be provided with a filter-silencer.杆和滚轮导架都要拆下来。Both the cam and its roller 26.are badly dented.凸轮和滚轮有严重凹陷。Both the cam and its roller are 27.badly dented.汽shaft on

缸的主轴拐挡差应调整到5毫米内。The defection of the main 28.塑 料油封盖变形了。the cylinders should be readjusted to a limit of 5mm.The plastic oil-sealing cover has 29.deformed.曲柄销应研磨并抛光。Crank-pin should be honed and 30.31.polished.汽你缸套裂了。们准备什么时候吊缸?The cylinder liner is cracked.When do you plan to lift the 32.piston out? 我们发现1号汽缸的活塞咬缸。We found the piston of 33.No.1 cylinder seizing.调整排气阀的间隙。Please adjust the clearance of the 34.exhaust valve.35.阀这杆扭弯了。是由于安The valve spindle is bent and twisted.装不当。This 36.aembly.is because of improper 唯一的办法就是重新安装。The only way to do is to 37.reaembly.你建议如何安装?What’s your suggestion for the 38.39.installation? 还这有什么要检查的?个系统要在运转情况下试验。What else do you have to check? The system should be 40.41.tested under operating condition.要检查汽缸吗?Will you inspect the cylinder cover? 42.总舵段对接检验。装置的安装位置有问题。Inspection of abutting edges of block.The installation position of 43.steering is not reasonable.安装工艺没有问题。These is no problem with the 44.45.installation proce.这让样可以吗?Is it the right way to do it? 46.there is anything wrong? 我们看看是否有问题?Let’s have a check to see if 47.你我们什么时候试车?们检查过了,一切正常。When will you begin the testing? We have checked and found it 48.49.O.K.应安消除振动。装的位置有点高。The vibration should be eliminated.The installation position is a little 50.higher.安装的位置正确,便于操作。The installation position is 51.proper and easy for operation.我们会按照你的意思修改。We will make a 52.according to your request.change 让我们到隔壁舱室看看。Let’s go to the next cabin to 53.have a look.你知道舵机出什么毛病了吗?Do you know what’s 54.55.wrong with the steering gear? 分空油机失灵了。压机有什么The oil separator is in trouble.毛病?What’s the trouble with the 56.compreor? 57.故让障现在还未找到。我们看一下故障在哪里。The trouble has not been located yet.Let’s see where the 58.lies.trouble 你能发现卫生水泵有什么毛病?Can you find out what is the 59.matter with the sanitary pump? 我不知道为什么机舱噪音这么大?I didn’t know why 60.was so much noise in the engine room.there 请找出毛病并予以排除。Please find out the trouble and 61.set it right.让我们到现场研究一下以确定毛病所在。Let’s investigate on the62.spot in order to ascertain where the trouble is.活63.aembly should be checked.塞组件的对中应校核一下。The alignment of the piston 这个活塞应很好的对中。This piston should be properly 64.centered.这与工艺及安装质量不好有关。It has something to do 主机安装用语(with poor workmanship and aembly.English for Installation of the Main English65.机舱里还有几台蒸汽机。)There are still a few 66.67.pumps in the engine room.stream 活活塞有点倾斜。塞与汽缸之间的间隙太大。The piston is a little bit inclined.The clearance between the 68.piston and the cylinder liner is too big.汽缸有敲击声。The sound of knocking can be heard from 69.cylinder.70.活我塞位置好象不正确。们在主机上做了一些额外的工作。The piston seems to be misaligned.71.work on the main engine.We did some extra 活塞应与活塞杆一起吊起。The piston 72.73.out together with its rod.should be lifted 弹活簧失去了弹性。塞的直径在公差范围内。The spring has lost its elasticity.The diameter of the piston is 74.within tolerance.请吊出主机的1号活塞。Please lift out No.1 piston of the 75.main engine.将所有活塞环从槽中取出。All the piston rings should be 76.taken out from the ring grooves.主机应重新安装。The main engine should be 77.78.reaembled.主79.轴轴可能已经变形。轴瓦破裂了。承的油槽要滚铣和倒角。The bearings shells are fractured.The main shaft may be deformed.The oil grooves of the bearing 80.81.should be milled and chamfered.把请中间轴放下。Manipulate down the intermediate shaft.inside.从里面抽出尾轴。Please withdraw the tail shaft from 82.尾轴管压盖填料应加油脂重新装填。83.of the sterntube should be greased and repackded.The gland packing 凸轮和滚轮之间的敲击应该避免。The knocking 84.85.occurs between cams and rollers should be avoided.that 齿活轮没有对正。塞须换一个。The meshing gears are misaligned.The piston should be replaced with 86.another one.扫气泵活塞应拉出来检查。87.pump should be pulled out for examination.The piston of the scavenging 活塞杆应与十字头孔配合。The piston 88.89.fitted with the crohead bore.rod should be 将活塞环倒一点角。Chamber the piston ring slightly.90.91.安安装好了吗?装好了。Have you finished the installation? 92.现The installation is over.这在可以启动吗?个叶片应进行热处理。Can I start it now? The blade should 93.heat-treatment.undergo 发电机在车间里实验过了,情况良好。The generator has 94.been tested in the shop and proved satisfactory.发电机需要送车间修理。95.96.to shop for repair.The generator should be shifted 主只机太重搬不动。The main engine is too heavy to move.97.take it on board.能解体搬运到船上。We have to have it dismantled to 你们需要专用工具拆装菜油机吗?Are you need special 98.tools for dismantling the diesel engine? 我们能使用机舱行车吗?Can we use 99.crane? the engine room 试试车钟是否完全正确。Try 100.correctne.the telegraph for 试一试主机的正、倒车。Give the engine a brief on 101.power ahead and astern.用盘车机转动主机一圈。Give the 102.complete turn with the turning gear.engine one 103.abnormal noise.听听发动机是否有异响。Listen if the engine has 检查主机第一缸的工作压力。Check the working 104.preure of N.1 cylinder of the main engine.校对发动机及舵机。Please maneuver 105.steering gears.engines and 106.使发动机逐步加速。107.it.使发动机减速停车。Speed the engine up gradually.Slow down the engine and stop 启动前将盘车机与主机脱开。Keep the turning gear 108.clear of the main engine before staring it.将活塞转到上止点。Turn the piston to the top dead 109.center.110.and found normal.锅炉已实验,发现正常。The boiler has been tested 这台机器已经组装好了,现在我们要实验了。This 111.machine is aembled.We are now going try it.绞缆机重装后对它做运转实验。Put the capstan to a 112.running test after it is re-aembled.113.not have through bolts.小的发动机可以不要贯穿螺栓。Smaller engines may 114.涡轮机噪音太大。The turbine is noisy.115.engine and generator can only be connected with coupling.辅机和发电机之间只能用联轴器连接。The auxiliary protection devices were tested under operating condition, 保护装置在运转情况下实验过,没有毛病。The 116.and they were found no trouble.调速器用来自动地调节发动机的速度。The governor 117.is used to regulates the engine speed automatically.阀门座面有一条裂缝。There is a flaw on the seat of 118.the valve.机器过热,请找出故障。It becomes 119.please find the trouble.coverheated, 1号发动机有什么问题?What’s gone wrong with 120.No.1 generator?

for these pistons should be provided.应为活塞提供一套耐磨环。A whole set of wear rings 装配过程用语(English for Fabrication Proce)121.船舶舷侧列板有两大作用。The side frames of a ship 122.have two principal functions.横向构件的自动生产线。Automactic aembly 123.transverse members.of 124.125.安装甲板下方的管道。Fitting the underdeck piping.请装上通风管道。安装甲板上的电缆托盘。Please fit the ventilation ducts.Fitting cable trays in a deck 126.panel.焊接及除烟装置。Welding and 127.equipment.fume-extracting 作业条件令人满意。The work condition 128.satisfactory.is 舾装在船台上完成。The outfitting 129.activities carried out on the building berth or dock.installation 使舾装工时达到最小。To minimize outfit installation 130.manhours.131.is eential.紧密的合作是必要的。A high degree of coordination 机舱和卧室的舾装。The 132.room and accommodation.outfitting of machinery 管子太长了。The tube is too long.133.134.135.这管子短了点。这块板太厚了。The tube is a little bit short.The plate is too thick.136.137.请给我一块薄点的板。甲板板厚度。机器外客的刚度。Thickne of the deck plating.Please give me a thinner plate.The stiffne of machinery casing 138.support.纵骨架式双底结构。Longitudinally-framed double 139.bottom structure.管道气割机在哪里?Where is the pipe 140.machine?

cutting 这里采用无法兰连接。Using the flangele joint in 141.this place.142.flow line for line shaping.管道数控加工自动流水线。Numerical controlled 143.安装没有问题。船用泵出了什么问题?No problem in installation.What’s wrong with marine 144.pump? 你们在安装水密门吗?Are you installing 145.watertight door?

the 防火门应该安装在哪里?Where the fire door to be 146.installed? 这是由于安装错误造成的。It’s due to the mistake of 147.the installation.请按图纸安装甲板机械。Please install the deck 148.machinery according to the drawing.149.排揽装置在哪?当心不要破坏了螺纹。Where is the spooling gear?

Take care not to damage the 150.threads.151.这样敲打有害。152.双头螺栓容易弯曲。It is harmful hammering like this.这个壳罩有污渣。There is sludge in the casing.The stud bends easily.153.154.155.螺帽拧紧了吗? 受力均匀吗?这些管子应拆除并更新。Are the strees evenly distributed? Are the nuts tight?

The tube should be removed 156.and replaced.备用尾轴的螺纹部分涂漆了吗?157.protion of the spare tailshaft well coated with paint.Is the threaded 我们检查过了,没问题。We have check it and found 158.it O.K.已实验过了,一切正常。It has been tested and 159.everything is O.K.这是设计问题造成的。It’s due to the mistake of 160.design.161.毛病还没找到。We have not found the trouble yet.162.安装好了吗?防火门不符合要求。Have you finished installation? The fire door is not satisfied with 163.the regulation.防火门需要重装。The fire door needs to be 164.reinstalled.165.166.能告诉我为什么吗?还不清楚。Itcan you tell me why? 167.’s not clear yet.这样做可以吗?Is it the right way to do it?

168.see if there is something wrong.让我们检查一下是否有问题。Let’s have a check to 169.甲板窗装好了吗?Has the deck gla been installed? 170.我们正在安装。We are doing it now.171.control gear.请检查一下天窗传动装置。Please check the skylight 172.173.舱盖长了舱盖有多宽? 一点。The hatchcover is a little bit longer.hatchcover?

舱盖板有多What is the breadth of the hatchcover? 长?What is the length of the 174.175.176.导缆钳在哪里? 在那里。请将人孔盖移开。It’s over there.where is the chock? Please move the manhole cover 177.away.178.to move.人孔盖太沉移不动。The manhole cover is too weight 179.我们一起移开它。水密门的把手坏了。Let’s move it away together.180.damaged.The nob of the watertight door is 换一个门把手。The nob of the door should be 181.renewed.请马上拆除这台主机。182.of the main engine at once.Please begin the overhauling 主机必须做航行试车。The main engine 183.undergo the sea trials.must 环槽应进行堆焊。The ring grooves should be 184.building up by welding.185.活塞顶坏了。这些螺丝太松了,The piston crown is damaged.应该紧固。These screws are loose, 186.they are to be tightened.187.管子直径多大?What’s the diameter of the pipes.188.接口处拧紧。当心不要破坏了螺纹。Close the joints tightly.Take care not to damaged the 189.threads.190.191.受力是否均匀? 要消除振动。这些钢管应当用夹子固定起来。The vibration should be eliminated.Are the strees evenly distributed? The steel pipes 192.should be secured with clamps.193.are not suitable.警铃安装的位置不适合。The position of alarm bells 这些螺钉松了,要拧紧。These screws are loose.They 194.should be tightened.把排气阀固定在它的开启位置。Lock the exhaust 195.valve in its open position.196.for tightening.检查所有紧固螺母的上紧度。Check all fixing-nuts 在这里装一个定位销,是相邻的两个部件对准。Fit 197.a dowel pin here to keep the adjacent parts aligned.198.请打一个中心标记。将全部有头螺钉加热并拧下来。Please stamp a center mark.199.the cap screws.Heat and unscrew all 200.拧开联轴器螺栓。做一个联轴器螺栓需要多长时间?Unbolt the shaft coupling bolts.how long will it 201.take to make a coupling bolts? 202.shut and sealed.排出阀已经关闭密封。The discharge valve have been 燃油管接头多大?what’s the size of 203.connection?

the fuel 阀盘已用铁丝绑紧。Valve disks are fastened 204.iron wire.with 绞缆机出毛病了。Something has gone wrong with the 205.capstan.206.我们需要使用这个滑车。We want to use this pulley.207.to disengage them.使用一个专门工具来把它们脱开。Use a special tool 请等一等,我去把工具拿给你。Please 208.moment, wait for a 你看见谁把弯扳手拿走了?I’ll get bent spanner away?

Did you notice 209.take the bent spanner away?

anyone 210.pa me that spanner please?

请你将扳手递给我好吗?Would you be so kind to 借给我双头扳手。Lend me a double-ended spanner

please.211.拆螺旋桨用的扳手在舵机间。The spanner for dismantling the propeller is the steering gear room.212.用完后请放回原处。Please put it back in its original place after use.213.我可以用一下这个台虎钳吗?May I use this table-vise for a moment? 214.可以用其他材料代替吗?Can it be substituted by some other kind of material? 215.什么材料能耐这样的高温。What material can resist such a high temperature? 216.把这些卸下来的部件移开以免损坏。Move this dismantled parts away lest they should get damaged.

《船厂生活用语(Life in The Yard).docx》
将本文的Word文档下载,方便收藏和打印
推荐度:
船厂生活用语(Life in The Yard)
点击下载文档
相关专题 船厂生活用语 船厂 用语 Yard 船厂生活用语 船厂 用语 Yard
[其他范文]相关推荐
    [其他范文]热门文章
      下载全文